翻訳と辞書
Words near each other
・ Dixon's Q test
・ Dixon's Return
・ Dixon, California
・ Dixon, Illinois
・ Dixon, Indiana
・ Dixon, Iowa
・ Dixon, Kentucky
・ Dixon, Missouri
・ Dixon, Montana
・ Dixon, Nebraska
・ Dixon, New Mexico
・ Dixon, New Orleans
・ Dixon, Wyoming
・ Dixon-Globe Opera House-Robinson-Schwenn Building
・ Dixon-Leftwich-Murphy House
Dixon-Yates contract
・ Dixona
・ Dixonius
・ Dixonius siamensis
・ Dixons
・ Dixons (Netherlands)
・ Dixons (retailer)
・ Dixons Allerton Academy
・ Dixons Carphone
・ Dixons City Academy
・ Dixons Creek, Victoria
・ Dixons Kings Academy
・ Dixons Lake
・ Dixons Mills, Alabama
・ Dixons Retail


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Dixon-Yates contract : ウィキペディア英語版
Dixon-Yates contract

The Dixon-Yates contract was a 1954 contract between the Atomic Energy Commission (AEC) and two private energy companies, Middle South Utilities and the Southern Company to supply 600,000 kilowatts of power to the AEC for their Tennessee plant. This power would replace power from the TVA (Tennessee Valley Authority), which could be used instead for the growing power demand of the city of Memphis, Tennessee. The TVA had asked for federal funds to build additional generating capacity for Memphis, but President Eisenhower opposed using taxes to provide tax-free low-interest financing to benefit one metropolitan area.
The contract, actually with the Mississippi Valley Generating Company to build a coal plant, was named after its two signatories: Edgar Dixon, the President of Middle South Utilities, and Eugene Yates the Chairman of the Board of the Southern. Kenneth Nichols, the AEC general manager, told AEC Chairman Lewis Strauss that replacing TVA power which the TVA was contracted to supply would cost an extra $4 million to $6 million a year, and would have preferred that the TVA procured the power directly. But Strauss and Eisenhower favoured the proposal, which was approved by the Joint Committee for Atomic Energy (JCAE) when it was still controlled by Republicans.
However, in the 1954 Congressional elections, the Democrats, who had made an issue of Dixon-Yates, won control of the House and Senate and in 1955 they gained chairmanship and majority control of the JCAE. The new chairman, Senator Clinton Anderson, reopened the Dixon-Yates hearings to force the AEC to cancel the contract. Most of the issues between the TVA and the AEC were resolved while Nichols was general manager, but eventually the city of Memphis came up with an alternative solution to its power needs and the contract was cancelled. Dixon-Yates claimed damages, but lost because of a conflict of interest involving a Bureau of the Budget consultant. Nichols said that "The AEC was absolved of any involvement in the conflict of interest. Thus ended a time-consuming political fiasco."